CIM thanks its subsidiary Sogema Engineering (SEG) as well as its partner Adekma, who successfully unloaded the RNG20, equipment weighing more than 17 tons!
The washing machine and sandblaster, supplied by NEU Railway, have also been put into service and are about to be received by the contracting authority Transamo.
The installation of the equipment is ongoing with the delivery to site of a turntable which will soon be placed in the workshop, as well as 18 lifting columns provided by MECHAN and a truck lift table provided by CEFAM.